Construction Progress - Image Gallery



Before Nov-08
(9 photos)



Nov-08
(7 photos)

 



Dec-08
(8 photos)




Jan-09
(8 photos)

 



Feb-09
(10 photos)




Mar-09
(10 photos)

 



Apr-09
(8 photos)



May-09
(11 photos)

 



Jun-09
(8 photos)




Jul-09
(9 photos)

 



Aug-09
(8 photos)




Sep-09
(11 photos)

 



Oct-09
(8 photos)




Nov/Dec-09
(16 photos)
 



Jan-2010
(11 photos)




Feb-2010
(11 photos)

 



Mar-2010
(11 photos)




Apr-2010
(8 photos)

 



May-2010
(9 photos)




Jun-2010
(8 photos)

   

Main Works

   - Completion of project fence

   - Construction of site offices

   - Demolition of existing builds

   - Site clearance and marking out

   - Completion of new 6m wide gov't      road to project

   - Setup of 2 container site offices      with AC, water and electric

   - Install marketing billboard vinyl      panels and steel frame

   - Construction tender process

   - Piles driven into ground in      preparation for caps

   - Conducted ground breaking      blessing

   - Ceremonial first concrete pouring

   - Completion of piling the entire site

   - Completion of building A Concrete      Structure 100%

   - Completion of building A Roof      Structure Steel

   - Commencement of roof finishes,      tiles, fascia and eaves

   - Completion of internal double skin      walls with sound insulation

   - Continue work to external and      internal Q-con block walls

   - Commencment of sanitary pipe      work first fix

   - Commence installation of electrical      conduits and wall boxes

   - Continue work forming and      concreting window and door      openings

   - Start plastering walls to the      Mock-Up Unit

   - Show unit floor & ceiling complete

   - Show unit kitchen & furniture,      doors and windows installed

   - Show unit final paint complete

   - Building D:
     • Foundations Complete
     • Ground Slap Finished
     • Formwork and Steel         Reinforcement Prep to 1st floor
     • Concrete Placing to 1st floor
     • Columns+Roof Beams Complete
     • Roof Structure Complete
     • Commence Roof Tiling

   - Start Execavation of Building C      Footings

   - Building C Footings and Stub      Columns Complete








   - Building D:
     • External Block Walls
     • Cavity Wall Insulation
     • Internal Walls & Door Openings
     • Block Above Lintels


   - Building C:
     • Ground Slab Prep
     • Ground Floor Concrete Pour
     • View from Rear Boundary
     • Ground Slab Steel Prep
     • Ground Slab Concrete Pour      • First Floor Beam Framing
     • First Floor Steel and Formwork

 

 - Building A:
     • Electrical Wiring and Start
        Ceilings

  - Building C:
     • Start Block Walls (Cavity Work)
     • Complted Roof
     • Interior/Exterior Block Work
     • Ready to Start Rendering

  - Building D:
     • Interior Render Walls Complete
     • Wall Rendering Complete

  - Building E:
     • Basement and Watertank
        Footing & Wall Reinforcement     
     • Waterproof Retaining Walls
        Prior to Back Fill


- Building A
:
     • Plaster ceilings and insulation
        complete
     • Aluminium door and window
        completeinstallation 80% done
     • Rain gutter and downpipes
        installed

- Building B:
     • Break ground last week of April

- Building C:
     • Internal and external wall
        rendering complete
     • First fix electrical and
        sanitary complete

- Building D:
     • Electrical conduits/cable,
       sanitary and air conditioning
       pipe work installed in ceilings
     • Start metal framework
       for gyprock ceilings
     • External Conwood ceilings
       commenced

- Building E:
     • Swimming pool concrete structure
       and pool deck complete
     • Reception, bar, restaurant and
       commercial kitchen slab complete
     • Commenced work to level 1
        fitness centre